CASE STUDY OVERVIEW
PROJECT SCOPE
A partner of Total Energy Solutions referred the district for a full system upgrade to improve durability, reliability, and compliance with current standards.
INTEGRATED SOLUTION
- Sealed bottom and belly pan to prevent saltwater intrusion and capture potential leaks
- All-aluminum enclosure and skid to resist rust and corrosion
- Special-coated alternator rim for extended coastal durability
- Hurricane-rated design to withstand high-velocity winds and wave exposure
The package provided a leak-free, rustproof and fully compliant standby power system that eliminated the municipal utility district’s dependence on temporary portable generators that could not withstand storm conditions.
IMPLEMENTATION AND TIMELINE
Week 1
Week 6
OUTCOMES
Rapid six-week sourcing vs. standard 16–18 weeks
Permanent, corrosion-resistant solution protecting against wave wash and salt exposure
Full compliance with power requirements for a 0.4 Million Gallons per Day (MGD) treatment plant
Ongoing maintenance agreement and service partnership established post-project
Total Energy Solutions delivers certainty where it matters most: for capital-intensive, safety-critical, and schedule-driven facilities across municipal, chemical, refinery, LNG, data center and infrastructure sectors where downtime isn’t an option. Learn more about Total Energy Solutions’ integrated solutions for the world’s most demanding operations at TotalEnergySolutions.com